How F1 Turns a Design into a Part in Days

Industry casesCNC machiningMass productionJul 19, 2026

The Race Ends on Sunday, but Development Never Stops

An F1 team gathers data in Friday practice and, if a problem is found, changes the part that same week. The car keeps evolving through the season, and the car at the opening race and the car at the final race are effectively different cars.

What makes this cycle possible is neither the driver nor the engineers' ideas. It is the manufacturing capability to turn a design change into a physical part within days. A large share of F1's competitive advantage lies in the factory, not on the track.

06_Real_Dallara_F308_Upright_Work_Scene.png

F1 Manufacturing in Numbers

A single team is known to make about 80,000 parts a year. That is a small number by mass-production standards, but the nature is entirely different in that almost every part is low-volume and most go through a design change at least once.

The use of metal additive manufacturing is also publicly documented. For the 2020 Alfa Romeo C39, 143 parts were made by metal additive manufacturing: 58 in titanium, 19 in high-performance aluminum alloy, and 66 in AlSi10Mg.

In short, F1 manufacturing comes down to this — high-mix, ultra-low-volume, ultra-short lead time, highest precision. It is the opposite extreme from mass production, and, as it happens, the same side where prototyping and low-volume manufacturing sit.

Why It Is Fast ① Make In-House What You Can

F1 teams are extremely vertically integrated. Carbon forming, machining, additive manufacturing, assembly, and metrology are mostly kept in-house. McLaren is known to outsource almost none of its composites manufacturing, with a standing workforce of around 130 people involved.

The reason is simple. Outsourcing creates waiting time. Even if quoting, ordering, scheduling, and shipping each take just one day, several days disappear. In an organization whose design change cycle is measured in weeks, this delay is directly a loss of performance.

This lesson applies directly to low-volume manufacturing too. Most of the lead time is not machining time but the waiting time before and after machining.

Why It Is Fast ② Finish in a Single Setup

F1 parts have complex geometry. Suspension uprights, gearbox casings, and hydraulic blocks are all shapes that must be machined from multiple directions.

On a 3-axis machine, the part must be re-fixtured for each direction. More setups do not only add time; they reduce precision. Each re-fixturing shifts the datum slightly and tolerances accumulate.

5-axis machining changes the tool orientation while the part stays clamped once, machining multiple faces.

3-Axis Multiple Setups

5-Axis Single Setup

Number of clampings

3–5

1

Tolerance

Accumulates with each setup

Set from one datum

Waiting

Re-fixturing and re-measuring between setups

None

Best for

Simple shapes, high volume

Complex shapes, low volume

This is why 5-axis is advantageous at low volume. The machine rate is higher, but the savings from eliminated setup labor and waiting time are larger the smaller the quantity.

Why It Is Fast ③ Use Machining and Additive Together

F1 does not use additive manufacturing only for prototypes. It is used widely for parts that go on the car, and also for fixtures, jigs, and flow-test models that support machining. There are reports that adopting additive manufacturing cut production lead time by 20–25%.

The key is not choosing one or the other but dividing the roles.

Nature of the part

Suitable method

Complex internal passages or hollow structures

Additive manufacturing

Precision fits, bearing seats, threads

Machining

Early prototypes needing only shape verification

Additive manufacturing

Parts whose strength, surface, and dimensions are actual service conditions

Machining

In practice, approaches that combine the two are also used: the blank shape is made by additive manufacturing and only the functional surfaces are finished by machining. Note also that the 2026 technical regulations allow suspension uprights to be additively manufactured in titanium or aluminum alloy, widening the range of application.

Why It Is Fast ④ No Tooling

Most F1 parts use no molds or dies. This is the decisive condition for speed.

In tooling-based production, a design change means modifying the tool, which takes weeks to months. In manufacturing without tooling, a design change ends with a CAD edit and rewriting the machining program. Low change cost means you can change often, and changing often means faster improvement.

For low-volume manufacturing, not building tooling is not simply a cost saving; it is a choice that buys development speed.

Inspection Is a Bottleneck Too

F1 controls precision on the order of ±5µm with CMM and probe measurement. There is a fact that is easy to miss here — inspection takes as much time as machining.

Requiring tight tolerances slows not only the machining process but also adds measurement equipment setup, writing the measurement program, and producing the inspection report. That is why even F1 does not control every dimension to the micron. It tightens only the functional dimensions.

What to Bring to Our Manufacturing — 4 Design Choices That Extend Lead Time

There is no need to imitate F1's methods exactly. But a sense of where lead time comes from can be used directly in low-volume manufacturing. Below are typical choices at the drawing stage that extend delivery.

Design choice

Why it slows things down

Alternative

Tight tolerances on every dimension

Machining + inspection effort increases across the board

Specify only functional dimensions individually; leave the rest to general tolerance

Excessively deep pockets

Long tools, slow cutting, managing tool deflection

Relax the depth-to-diameter ratio; consider access from the opposite side

Small internal corner R

Small tool → sharp drop in material removal

Make the corner R at least the tool radius

Low roughness specified on all surfaces

Added finishing pass or separate process

Specify only functional surfaces

There is one common principle. Spend precision only where it is needed. This is not a cost-cutting technique; it is the very reason F1 can swap parts in a matter of days.

Frequently Asked Questions

Are F1 parts really made in a few days?

It depends on part size and complexity. Some, such as replacing damaged parts or urgent improvements, turn around within a day, while others take weeks. The claim that "every part comes out in a day" is an exaggeration; it is more accurate to say they have built a system that can deliver the needed part at the needed time.

Is 5-axis machining always better than 3-axis?

No. For simple shapes finished from one direction, 3-axis is cheaper and faster. The value of 5-axis is eliminating setups on shapes that need machining from several directions, so it is advantageous only when the shape meets that condition.

Why is 5-axis cost-effective at low volume?

The machine hourly rate is high, but the labor for setup, re-fixturing, and re-measuring disappears. In mass production setup cost is spread per piece and diluted, but the smaller the quantity, the larger the share of setup cost, so the advantage of a single setup grows.

Should we use additive manufacturing for our parts too?

It is effective at the shape verification stage or for internal structures that cannot be machined. On the other hand, if fits, threads, or precision seating surfaces are the core of the function, machining is the right answer. The two methods are not substitutes but tools with different roles.

Summary

  • F1's competitiveness is not speed but a manufacturing cycle that turns design changes into physical parts within days

  • About 80,000 parts per team per year — high-mix, ultra-low-volume, ultra-short lead time, high precision

  • Why it is fast: in-house manufacturing (no waiting) · 5-axis single setup · machining + additive together · no tooling

  • Lead time comes more from waiting, setup, and inspection than from machining time

  • Inspection is a bottleneck too — tightening only the functional dimensions is the condition for speed

  • Low-volume manufacturing without tooling is not a cost saving but a choice that buys development speed

Upload a drawing to see how your geometry and tolerances affect the manufacturing method and lead time.

Have a part to machine?

Upload a drawing to see your quote.

Sponsorship & lab support

From competition prep to research projects,
we build alongside student teams and labs.

Questions?

KakaoTalk chat
031-509-0523